Yokogawa EJX210B Uživatelský manuál Strana 22

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 101
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 21
<4. Installation>
4-4
IM 01C27C01-01EN
4.7 Afxing the Teon Film
The FEP Teon option includes a teon lm and
uorinated oil. Before mounting the transmitter to
the process ange, afx the teon lm as follows:
IMPORTANT
1) Position the diaphragm so that the
diaphragm is in a upward position.
2) Pour the uorinated oil on the diaphragm
and gasket area covering it completely
and evenly. Be careful not to scratch the
diaphragm or change the its shape.
3) Afx the teon lm over the diaphragm and
gasket area.
4) Next, carefully inspect the cover and try
to identify any entrapped air between
the diaphragm and the teon lm. The
air must be removed to ensure optimum
performance. If air pockets are present, use
your ngers to remove the air by starting at
the center of the diaphragm and work your
way out.
5) Position the gasket on the Teon lm.
6) Mount the transmitter onto the process
ange.
Teflon film
Diaphragm
Fluorinated oil
[PART No. : F9145YN]
Gasket area
PART No.
F9347XA
F9347YD
Prosess Flange size
3 inch (80mm)
2 inch (50mm)
F0407.ai
Figure 4.7 Afxing the Teon Film
Zobrazit stránku 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 100 101

Komentáře k této Příručce

Žádné komentáře