IM 01E20D01-01E
3-20
3. INSTALLATION
Table 3.3.17 Installation Foundation Dimensions (Size
500 mm (20 in.) to 1000 mm (40 in.)).
Location
Unit: mm(approx. inch)
Size mm(inch)
500 (20)
600 (24)
700 (28)
800 (32)
900 (36)
1000 (40)
A
350(13.8)
400(15.7)
450(17.7)
550(21.7)
700(27.6)
800(31.5)
B
350(13.8)
400(15.7)
500(19.7)
550(21.7)
650(25.6)
700(27.6)
C
420(16.5)
470(18.5)
570(22.4)
620(24.4)
720(28.3)
770(30.3)
D
125(4.9)
125(4.9)
125(4.9)
125(4.9)
125(4.9)
125(4.9)
Tab3.2.10b.eps
(5) Installation Foundation Dimensions(Size
1100 mm (44 in.) to 2600 mm (104 in.))
Ta b.3.2.11a.eps
A
A
16-R hole
F
E
DCB
* Check the foundation
dimensions in External
Dimensions.
Table 3.3.18 Installation Foundation Dimensions (Size
1100 mm (44 in.) to 2600 mm (104 in.))
Tab3.2.11b.eps
1100(44)
1200(48)
1350(54)
1500(60)
1600(64)
1800(72)
2000(80)
2200(88)
2400(96)
2600(104)
1,211(47.7)
1,261(49.6)
1,366(53.8)
1,490(58.7)
1,698(66.9)
1,864(73.4)
2,010(79.1)
2,172(85.5)
2,218(87.3)
2,300(90.6)
720(28.3)
780(30.7)
880(34.6)
980(38.6)
1,080(42.5)
1,180(46.5)
1,300(51.2)
1,430(56.3)
1,560(61.4)
1,700(66.9)
1,100(43.3)
1,200(47.2)
1,350(53.1)
1,500(59.1)
1,650(65.0)
1,800(70.9)
2,000(78.7)
2,200(86.6)
2,400(94.5)
2,600(102.4)
AB
±2
C
±3
1,280(50.4)
1,380(54.3)
1,540(60.6)
1,700(66.9)
1,850(72.8)
2,000(78.7)
2,220(87.4)
2,420(95.3)
2,620(103.1)
2,820(111.0)
D
130
(5.12)
170
(6.69)
200
(7.87)
E
200
(7.87)
250
(9.84)
300
(11.81)
F
19
(0.75)
22
(0.87)
R
Dimensions
Size
mm (inch)
Location
Unit: mm(approx. inch)
(6) Tightening Nuts
Pass the bolts from pipe line side, not flowtube side,
and tighten the bolts according to the torque values for
the metal piping in Table 3.3.19
Finish a brackets part with mortar.
CAUTION
Be sure to tighten the nuts according to the
prescribed toeque values. Tighten them diago-
nally with the same torque values, step by up
to the prescribed torque value.
Completely cover the brackets and liners with
mortar.