Yokogawa RotaMASS 3-Series Uživatelský manuál Strana 6

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 76
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 5
IM 01R04B08-00E-E 1st edition February 15, 2012 -00
All Rights Reserved. Copyright © 2012, Rota Yokogawa
<1. INTRODUCTION>
1-2
Protectivegroundingterminal
Functional grounding terminal
(This terminal should not be used as a pro-
tectivegroundingterminal.)
Alternatingcurrent
Direct current
1.1 Using the Coriolis
Flowmeter Safely
WARNING
(1) Installation
•InstallationoftheCoriolisowmetermustbe
performed by expert engineer or skilled person-
nel.Nooperatorshallbepermittedtoperform
procedures relating to installation.
•TheCoriolisowmeterisaheavyinstrument.
Be careful that no damage is caused to person-
nel through accidentally dropping it, or by exert-
ingexcessiveforceontheCoriolisowmeter.
WhenmovingtheCoriolisowmeter,always
useatrolleyandhaveatleasttwopeoplecarry
it.
•WhentheCoriolisowmeterisprocessinghot
uids, the instrument itself may become
extremely hot. Take sufficient care not to get
burnt.
•Wheretheuidbeingprocessedisatoxic
substance,avoidcontactwiththeuidand
avoidinhalinganyresidualgas,evenafterthe
instrument has been taken off the line for main-
tenance and so forth.
•Allproceduresrelatingtoinstallationmustcom-
ply with the electrical code of the country where
it is used.
(2) Wiring
•ThewiringoftheCoriolisowmetermustbe
performed by expert engineer or skilled person-
nel.Nooperatorshallbepermittedtoperform
procedures relating to wiring.
•Whenconnectingthewiring,checkthatthe
supplyvoltageiswithintherangeofthevoltage
specied for this instrument before connecting
the power cable. In addition, check that no
voltageisappliedtothepowercablebefore
connecting the wiring.
•Theprotectivegroundingmustbeconnected
securely at the terminal with the mark to
avoiddangertopersonnel.
(3) Operation
•Donotopenthecoveruntilthepowerhasbeen
off for at least 10 minutes. Only expert engi-
neer or skilled personnel are permitted to open
thecover.
(4) Maintenance
•MaintenanceontheCoriolisowmetershould
be performed by expert engineer or skilled
personnel.Nooperatorshallbepermittedto
perform any operations relating to maintenance.
•Alwaysconformtomaintenanceprocedures
outlined in this manual. If necessary, contact
Yokogawa.
•Careshouldbetakentopreventthebuildup
of dirt, dust or other substances on the display
panel glass or data plate. If these surfaces do
get dirty, wipe them clean with a soft dry cloth.
(5)EuropeanPressureEquipmentDirective
(PED)
•WhenusingtheinstrumentasaPED-compliant
product, be sure to read Chapter 10 before use.
(6)HazardousDutyTypeInstruments
•Forexplosionprooftypeinstrumentsthe
description in chapter 9 "EXPLOSION
PROTECTEDTYPEINSTRUMENT" has
priority to the other descriptions in this instruc
tion manual.
•AllinstructionmanualsforATEXExrelated
productsareavailableinEnglish,Germanand
French. Should you require Ex related instruc
tions in your local language, you should
contact your nearest Yokogawa office or
representative.
•Onlytrainedpersonalshouldinstalland
maintaininstrumentsinhazardousareas.
•Theprotectivegroundingterminal must be
connected to a suitable IS grounding system.
•Avoidmechanicalgeneratedsparkswhile
working on the equipment and peripherally
devicesinhazardousareas.
Zobrazit stránku 5
1 2 3 4 5 6 7 8 9 10 11 ... 75 76

Komentáře k této Příručce

Žádné komentáře