<Appendix1. Safety Instrumented Systems Installation>
A1-2
IM 01E30D01-01EN
Table A1.2 Proof Testing
Testing method Tools required Expected outcome Remarks
Analog Output Loop Test and Calibration
1
.BypassthesafetyPLCorthenal
element interface or take other
appropriate action to avoid a false trip.
AnalogOutputLoopTest:
2. Send a HART or BRAIN command to
the Magnetic Flowmeter to go to the
high alarm current output and verify that
the analog current reaches that value
and verify that discrete contact has de-
energized (if used)
3. Send a HART or BRAIN command to
the Magnetic Flowmeter to go to the low
alarm current output and verify that the
analog current reaches that value.
4. Use the HART or BRAIN communicator
to view detailed device status to ensure
no alarms or warnings are present in the
Magnetic Flowmeter.
5. Perform reasonability check on the
sensor value(s) versus an independent
estimate (i.e. from direct monitoring of
BPCS value) to show current reading is
good.
●Calibration
6
.Verifythemeasurementfortwoow
points.
7. Restore the loop to full operation.
8. Remove the bypass from the safety PLC
or otherwise restore normal operation.
BT200
•
HARTconguration
tool
Proof Test Coverage
=96%
The output needs to be
monitored to assure that
the Magnetic Flowmeter
communicates the correct
signal.
A1.2.6 Repair and Replacement
If repair is to be performed with the process online
theAXRwillneedtobebypassedduringthe
repair. The user should setup appropriate bypass
procedures.
IntheunlikelyeventthattheAXRhasafailure,the
failures that are detected should be reported to
Yokogawa.
W
henreplacingtheAXR,theprocedureinthe
installation manual should be followed.
The personnel performing the repair or replacement
o
ftheAXRshouldhaveasufcientskilllevel.
A1.2.7 Startup Time
TheAXRgeneratesavalidsignalwithin10second
of power-on startup.
A1.2.8 Firmware Update
Incasermwareupdatesarerequired,they
will be performed at factory. The replacement
responsibilities are then in place. The user will not
berequiredtoperformanyrmwareupdates.
A1.2.9 Reliability Data
A detailed Failure Mode, Effects, and Diagnostics
Analysis (FMEDA) report is available from
Yokogawa with all failure rates and failure modes.
TheAXRiscertieduptoSIL2foruseinasimplex
(1oo1)conguration,dependingonthePFDavg
respectively PFH calculation of the entire Safety
Instrumented Function.
T
hedevelopmentprocessoftheAXRiscertiedup
to SIL3, allowing redundant use of the transmitter
up to this Safety Integrity Level, depending the
PFDavg respectively PFH calculation of the entire
Safety Instrumented Function.
When using the transmitter in a redundant
c
onguration,theuseofacommoncausefactor
-factor)of5%issuggested.Iftheowner-operator
of the plant would institute common cause failure
training and more detailed maintenance procedures
for avoiding common cause failure, a beta factor of
2% would be applicable.
Zobrazit stránku 186